Technology 2 MIN READ

GSLV-F17 Successfully Released EOS-05 Satellite into Space

At 2:55 AM on September 4, India's GSLV-F17 rocket successfully launched from Sriharikota and placed the EOS-05 satellite into its designated orbit. This mission was conducted from the second launch pad at Satish Dhawan Space Centre.
Launch of GSLV-F17 rocket from Sriharikota
Launch of GSLV-F17 rocket from Sriharikota / Social Media

See more of our coverage in your search results.

Follow us on Google

At 2:55 AM on September 4, India's GSLV-F17 rocket successfully launched from Sriharikota and placed the EOS-05 satellite into its designated orbit. This mission was conducted from the second launch pad at Satish Dhawan Space Centre.

GSLV-F17 is the 19th flight of India's GSLV rocket, which delivered the EOS-05 Earth Observation satellite into a Sub-Geosynchronous Transfer Orbit. This satellite will collect images of the Earth and related information from space.

The rocket operates in three stages. At the bottom is the first stage, a large solid rocket motor named S139, containing about 138 tons of propellant and operating for approximately 100 seconds. It provides up to 4,800 kilo Newtons of thrust. Four liquid boosters are attached to its sides.

After the first stage, the second stage GS2 activates, equipped with a Vikas engine running on liquid fuel. This stage operates for about 150 seconds and produces up to 846 kilo Newtons of thrust. Its role is to provide the rocket with further altitude and speed so the satellite can move toward its designated orbit.

The third stage is the cryogenic upper stage (CUS), which runs on liquid oxygen and liquid hydrogen. This engine delivers up to 75 kilo Newtons of thrust and operates for about 814 seconds. Its job is to give the satellite the necessary speed to reach the transfer orbit. This cryogenic stage was developed in India and has been used in GSLV missions since January 2014.

At the very top of the rocket, the EOS-05 satellite is housed inside a 4-meter diameter ogive composite payload fairing, which protects the satellite from air pressure and external effects while passing through the atmosphere.

The height of GSLV-F17 is approximately 51.7 meters, and its mass at launch is about 420 tons. In this mission, the three stages of the rocket have distinct roles that together deliver the satellite to its designated orbit.

Member Access

5 free articles left today

0 of 5 free reads used today.

Go Unlimited
📲 Follow us The latest, straight to your phone — instantly, free
Telegram Channel

Most read

Most read

01 India India to Gain Continuous Earth Monitoring Capability with EOS-05 Satellite
02 Faith / Spirituality Offering Bhog to Laddu Gopal on Janmashtami Brings Auspicious Results
03 Rajasthan Bera village's unpaved roads worsen after rain, travel difficult
04 Rajasthan Voting to be held in 25 wards in Sambhar on September 9
Trust & Transparency

How this story was handled

PublishedSep 04, 2026, 09:43 IST IST
Last updatedSep 04, 2026, 09:43 IST IST
Story lifecyclePublish
Methodology

How to read this report

Coverage is filed under Technology and aligned with that desk's editorial standards.

Continuing Coverage

More on this story

Latest context and follow-up reading from Technology.

Technology

ISRO launched EOS-05 satellite from Sriharikota

Technology

ISRO launches first geosynchronous earth imaging satellite EOS-05

Recommended Stories

More from Technology
ISRO launched EOS-05 satellite from Sriharikota
Technology
Related stories

ISRO launched EOS-05 satellite from Sriharikota

News Desk Sep 04, 2026
ISRO launches first geosynchronous earth imaging satellite EOS-05
Technology
Related stories

ISRO launches first geosynchronous earth imaging satellite EOS-05

News Desk Sep 04, 2026

Most read

Most read

01 India India to Gain Continuous Earth Monitoring Capability with EOS-05 Satellite
02 Faith / Spirituality Offering Bhog to Laddu Gopal on Janmashtami Brings Auspicious Results
03 Rajasthan Bera village's unpaved roads worsen after rain, travel difficult
04 Rajasthan Voting to be held in 25 wards in Sambhar on September 9

Comments

0 threads
Join the discussion
Staff comments are highlighted. Verified readers receive a trust badge.
Sign in to comment

No approved comments yet. Start the discussion.